Q-2, r. 35.3.01 - Regulation respecting manure anaerobic digestion projects eligible for the issuance of offset credits

Full text
51. The promoter may entrust the verification of a project report to a verification body in accordance with section 50 if the body, the verifier designated by that body to conduct the verification and the other members of the verification team
(1)  have not acted for the promoter, in the 3 preceding years, as a consultant for the purpose of developing the project or calculating the GHG emission reductions attributable to the project; and
(2)  have not verified project reports covering more than 6 consecutive reporting periods for the project being verified.
In addition, when the promoter wishes to have the project report verified by a verification body other than the verification body that verified the report for the preceding reporting period, the verification body entrusted with the verification, the verifier designated by that body to conduct the verification and the other members of the verification team, must not have verified a project report covering the 3 preceding reporting periods for that project.
M.O. 2023-1010, s. 51.
In force: 2023-12-28
51. The promoter may entrust the verification of a project report to a verification body in accordance with section 50 if the body, the verifier designated by that body to conduct the verification and the other members of the verification team
(1)  have not acted for the promoter, in the 3 preceding years, as a consultant for the purpose of developing the project or calculating the GHG emission reductions attributable to the project; and
(2)  have not verified project reports covering more than 6 consecutive reporting periods for the project being verified.
In addition, when the promoter wishes to have the project report verified by a verification body other than the verification body that verified the report for the preceding reporting period, the verification body entrusted with the verification, the verifier designated by that body to conduct the verification and the other members of the verification team, must not have verified a project report covering the 3 preceding reporting periods for that project.
M.O. 2023-1010, s. 51.